Skip to content
Driveway King logo

Contractors for Complete Driveway Removal and Replacement

By Driveway King

Driveway King handles complete concrete driveway removal and replacement in Colorado Springs and the Front Range. Our work covers the agreed demolition and haul off, exposed ground evaluation, defined base preparation, form work, reinforcement, new concrete, finish, joints and curing. The owner handles the evaluation, written proposal and oversight, with work limits and separately priced items established before construction begins.

Request My Complete Replacement Estimate | Call 719.323.5024

One defined scope from the old slab to the finished driveway

Complete replacement removes the existing concrete within the agreed boundaries and builds a new driveway. It gives us access to the supporting material and allows the new layout, grades and joints to be planned together. An overlay or a selected panel repair is a different scope.

The owner brings 21 years of Colorado concrete experience to that planning. Our proposal connects the removal limits with the construction that follows, so responsibility continues through the finished driveway and its care instructions.

Completed driveway project in Rockrimmon

Rockrimmon, Colorado Springs | June 2024 | 2,400 sq ft

Long residential driveway replacement in Rockrimmon, Colorado Springs

Long residential driveway replacement. Rockrimmon, Colorado Springs. Completed June 2024. 2,400 sq ft.

In Rockrimmon, Colorado Springs, we replaced a 2,400 square foot residential driveway in June 2024. Cracked panels, rough surface wear and uneven sections extended along the route to the garage. Full replacement allowed the garage connection, intermediate sections and lower approach to be considered together.

The old concrete was broken out and removed. We evaluated the exposed ground, corrected support with excavation and replacement gravel where needed, and compacted the base in layers. Form work established the perimeter and drainage grades before reinforcement was positioned.

Concrete was placed in a planned sequence through the wider and narrower sections. A broom finish, organized control joints, finished edges, garage separation and curing completed the replacement. The finished gray approach carries a consistent appearance along the full route. This case shows the continuity of work from demolition through a coordinated completed driveway.

See this completed project

What our replacement proposal needs to resolve

Scroll the table sideways to see every column

StageWhat we establish for the project
Work boundariesThe driveway area to remove and the adjoining structures included or excluded
RemovalAccess, protection of identified features, concrete breakup, loading and haul off
Supporting groundEvaluation after removal, included excavation and defined base corrections
New constructionCompacted gravel, form work, elevations, supported reinforcement and concrete
Surface completionSelected finish, edges, joints and connections to adjoining surfaces
HandoverCuring, cleanup, stated restoration limits and return to vehicle use instructions

Compare proposals across these stages. The phrase “complete replacement” needs defined boundaries and completion responsibilities behind it.

Establish the boundary at the garage, landscape and street

We identify where the driveway work stops. A garage floor, walkway, retaining wall or landscape area is not automatically part of the replacement. If you want adjoining work completed, include it in the evaluation so it can be described and priced.

The street connection requires the same attention. Aprons, curbs, gutters and sidewalks may involve a separate scope, an appropriately licensed contractor and jurisdiction coordination. We address that responsibility during planning rather than treating all concrete near the driveway as one item.

Decide how exposed conditions will be handled

The surface does not reveal every condition beneath it. Once the old concrete is removed, the exposed ground can be evaluated directly. Our scope identifies included preparation and the process for any additional correction.

If the required work extends beyond that scope, the proposed change identifies the location, work, price and effect on timing for written approval. You can evaluate that decision while the condition is exposed.

Connect the estimate with a workable construction plan

Removal equipment, gravel delivery and concrete placement need access. We discuss gates, masonry, trees, irrigation and other nearby features that affect the route. Tell us about private lines or installations you know about, accessibility needs and other contractors working at the home.

We also plan vehicle relocation and pedestrian access before demolition. The driveway remains closed to vehicle traffic through the applicable curing period, even after the concrete crew finishes. Follow the project’s return to traffic instructions, including any restrictions on heavier deliveries.

Know what completion includes

At handover, the agreed work area should be cleaned and the stated restoration completed. We explain curing, care and when the driveway can be used. Keep the proposal, approved changes and written warranty together.

The standard workmanship warranty is one year, with two additional years available for a fee on qualifying jobs. Coverage follows its written terms. Discuss the extension during the proposal process if it interests you.

Compare complete projects before choosing a contractor

The tear out and replacement cost guide explains how removal, preparation and construction affect the budget. Our replacement service explains the building sequence in more detail.

For a useful estimate, send your address and describe the condition and desired result. Photos and approximate measurements are optional. The site evaluation leads to a written scope, agreed contract and schedule.

Frequently asked questions

Does complete driveway replacement include hauling away the old concrete?

Yes. Our complete replacement scope includes loading and hauling away the demolished concrete within the stated work limits. The proposal identifies the area and any separate demolition work.

Is the garage floor included in the driveway replacement?

Only when the proposal expressly includes it. The garage slab and exterior driveway are separate work areas. We define their boundary and connection before removal begins.

Who is responsible for base preparation after the concrete is removed?

Base preparation is part of our defined replacement scope. We evaluate the exposed material, perform the included work and document any additional correction for approval before proceeding.

Will the replacement include new drains or landscape restoration?

Only within the stated scope. We evaluate drainage needs and identify proposed improvements. Restoration beside the driveway also needs clear limits so the final price reflects the work you selected.

How do I compare a complete replacement contractor with a removal-only contractor?

Compare the endpoint of each proposal. A removal-only scope leaves the new driveway construction for someone else. Our replacement proposal carries the agreed work through preparation, concrete, completion and care instructions.

What should I receive when the replacement is finished?

Keep the written proposal, approved changes, warranty terms and project care instructions. The handover should explain curing and return to vehicle use, along with the cleanup and restoration included in your scope.

Put the entire replacement scope in writing

Send your address and the driveway areas you want replaced. We will evaluate the removal, access, preparation and new construction together so your proposal describes the project through completion.

Request My Complete Replacement Estimate | Call 719.323.5024

CallRequest an Estimate